FLEXI-Pit provides on-site adjustability for drainage catch pits around the Arley tunnel cutting slopes
Case Study Details
Client
Murphy's
Location
Arley, UK
Product
STAKKAbox™ ULTIMA, FLEXI-PIT, AX-S™ Composite Access Cover,
Sector
Rail
Case Study
Cubis supplied its Network Rail approved track-side drainage inspection chamber system FLEXI-Pit to the Arley Tunnel, Drainage and earthworks project in conjunction with Murphy’s.
The FLEXI-Pit drainage system has been designed and developed to offer easily adjustable duct positions for varying pipe invert levels onsite and is created from Cubis’ STAKKAbox™ ULTIMA access chamber system. The ULTIMA provides a modular, scalable solution available in a variety of sizes that are easily adaptable, lightweight, fast and easy to install. Seamless integration with Cubis’ chamber accessories and AX-S™ composite access covers provided the client with a complete underground drainage system solution.